Here is a DC70 standard construction 1/2″ thick shell with 3/4″ tire support being unloaded and installed on a 5 ton Barber Greene plant in Massachusetts. In this case, we also supplied the inlet breaching with ceramic lined chute (not in picture).
![](http://asphaltproducers.net/wp-content/uploads/2020/04/image-1.jpeg)
![](http://asphaltproducers.net/wp-content/uploads/2020/04/image-2.jpeg)
![](http://asphaltproducers.net/wp-content/uploads/2020/04/image-3.jpeg)
![](http://asphaltproducers.net/wp-content/uploads/2020/04/image-4.jpeg)
Here is a DC70 standard construction 1/2″ thick shell with 3/4″ tire support being unloaded and installed on a 5 ton Barber Greene plant in Massachusetts. In this case, we also supplied the inlet breaching with ceramic lined chute (not in picture).